Scorpio Gold Reports Results from 2014 Expansion Drilling at the Bluelite Satellite Deposit, Mineral Ridge Project, Nevada


Vancouver, December 1, 2014 - Scorpio Gold Corporation ("Scorpio Gold" or the "Company") (TSX-V: SGN) reports additional results from the 2014 expansion drilling program on the Bluelite deposit at its70% owned Mineral Ridge project, located in Nevada.

As reported in the Company's July 21, 2014 news release, an updated Life of Mine Plan ("LOM") for the Mineral Ridge Operation encompasses the currently producing Drinkwater and Mary LC pits and five adjacent satellite deposits, including the Bluelite deposit. The cut-off date for the LOM was March 31, 2014. Continued drilling since the March 31, 2014 cut-off date is designed to potentially upgrade and increase the reported mineral reserve and resource estimate and potentially extend life of mine. 

Drilling on the Bluelite deposit continues to meet with success, returning significant intercepts both within and extending outside of the pit shell outline modelled in the updated LOM. Management fully expects these results will lead to an upgrade and expansion of the mineral resources currently defined for the Bluelite deposit. 

Highlights from this latest phase of drilling on the Bluelite deposit include:

  • MR141036: 1.47 grams per tonne ("g/t") gold over 10.67 meters
  • MR141037: 0.93 g/t gold over 16.76 meters
  • MR141040: 1.93 g/t gold over 7.62 meters
  • MR141067: 0.99 g/t gold over 13.72 meters
  • MR141117: 1.87 g/t gold over 9.14 meters
  • MR141120: 6.37 g/t gold over 9.14 meters

Table 1. Bluelite Deposit - Significant Drill Results

Hole No. Azm
(deg)
Dip
(deg)
From
(ft)
To
(ft)
Width
(ft)
From
(m)
To
(m)
Width
(m)
Gold
(OPT)
Gold
(g/t)
MR14831 225 -75 50 60 10 15.24 18.29 3.05 0.017 0.57
      360 370 10 109.73 112.78 3.05 0.019 0.64
      440 480 40 134.11 146.30 12.19 0.018 0.61
MR14832 225 -55 180 185 5 54.86 56.39 1.52 0.011 0.38
      340 345 5 103.63 105.16 1.52 0.015 0.51
      370 375 5 112.78 114.30 1.52 0.015 0.51
      520 535 15 158.50 163.07 4.57 0.014 0.48
      570 580 10 173.74 176.78 3.05 0.020 0.67
      655 665 10 199.64 202.69 3.05 0.023 0.77
      685 715 30 208.79 217.93 9.14 0.040 1.38
MR14845 0 -90 265 295 30 80.77 89.92 9.14 0.023 0.80
      315 325 10 96.01 99.06 3.05 0.030 1.01
      340 350 10 103.63 106.68 3.05 0.025 0.86
      385 390 5 117.35 118.87 1.52 0.065 2.23
      425 435 10 129.54 132.59 3.05 0.023 0.79
MR14971 0 -90 No Significant Results
MR141036 225 -75 200 235 35 60.96 71.63 10.67 0.043 1.47
      285 290 5 86.87 88.39 1.52 0.010 0.34
      295 300 5 89.92 91.44 1.52 0.010 0.34
      305 310 5 92.96 94.49 1.52 0.010 0.34
      385 400 15 117.35 121.92 4.57 0.039 1.34
      450 485 35 137.16 147.83 10.67 0.017 0.60
MR141037 225 -55 210 230 20 64.01 70.10 6.10 0.017 0.58
      285 290 5 86.87 88.39 1.52 0.011 0.36
      390 395 5 118.87 120.40 1.52 0.019 0.65
      210 230 20 64.01 70.10 6.10 0.017 0.58
      425 480 55 129.54 146.30 16.76 0.027 0.93
MR141040 0 -90 30 35 5 9.14 10.67 1.52 0.015 0.51
      160 165 5 48.77 50.29 1.52 0.013 0.45
      290 295 5 88.39 89.92 1.52 0.018 0.62
      320 330 10 97.54 100.58 3.05 0.055 1.87
      345 360 15 105.16 109.73 4.57 0.022 0.75
      380 405 25 115.82 123.44 7.62 0.056 1.93
MR141067 0 -90 120 125 5 36.58 38.10 1.52 0.057 1.94
      215 220 5 65.53 67.06 1.52 0.010 0.34
      240 245 5 73.15 74.68 1.52 0.013 0.45
      275 285 10 83.82 86.87 3.05 0.027 0.91
      300 345 45 91.44 105.16 13.72 0.029 0.99
      400 405 5 121.92 123.44 1.52 0.024 0.82
      445 450 5 135.64 137.16 1.52 0.024 0.83
      500 505 5 152.40 153.92 1.52 0.019 0.63
      525 530 5 160.02 161.54 1.52 0.085 2.91
      635 640 5 193.55 195.07 1.52 0.019 0.64
MR141111 0 -90 55 60 5 16.76 18.29 1.52 0.042 1.44
      325 330 5 99.06 100.58 1.52 0.015 0.51
MR141113 0 -90 50 60 10 15.24 18.29 3.05 0.033 1.12
      80 85 5 24.38 25.91 1.52 0.020 0.67
      200 205 5 60.96 62.48 1.52 0.010 0.35
MR141114 0 -90 50 60 10 15.24 18.29 3.05 0.087 2.98
MR141115 0 -90 430 445 15 131.06 135.64 4.57 0.025 0.86
MR141116 0 -90 205 230 25 62.48 70.10 7.62 0.036 1.25
      245 260 15 74.68 79.25 4.57 0.018 0.63
      290 295 5 88.39 89.92 1.52 0.051 1.75
      440 450 10 134.11 137.16 3.05 0.066 2.26
      470 475 5 143.26 144.78 1.52 0.084 2.86
MR141117 0 -90 10 15 5 3.05 4.57 1.52 0.026 0.89
      240 270 30 73.15 82.30 9.14 0.055 1.87
incl.     240 245 5 73.15 74.68 1.52 0.246 8.43
      405 410 5 123.44 124.97 1.52 0.042 1.44
MR141118 0 -90 50 55 5 15.24 16.76 1.52 0.030 1.03
      105 110 5 32.00 33.53 1.52 0.063 2.16
      165 170 5 50.29 51.82 1.52 0.011 0.38
MR141120 0 -90 120 150 30 36.58 45.72 9.14 0.186 6.37
      165 170 5 50.29 51.82 1.52 0.030 1.03
      185 190 5 56.39 57.91 1.52 0.014 0.48


All holes presented in Table 1 were completed by reverse circulation (RC) drilling. True width is estimated at 90-100% of downhole width. Analytical results were performed by American Assay Laboratory Inc. in Sparks, Nevada, an ISO/IEC 17025:2005 accredited facility. External check assays to verify lab accuracy are routinely completed by ALS Chemex, an ISO 9001:2000 certified and ISO/IEC 17025:2005 accredited facility. Further details are presented in the Company's quality assurance and quality control program for the Mineral Ridge project at: MR QAQC

Upcoming Conference:

Scorpio Gold's President, Steve Roebuck, will be attending the Mines and Money London 2014 Conference held at the Business Design Centre, London, UK, on December 2-4, 2014. Mr. Roebuck looks forward to meeting shareholders and interested parties at booth F12. Further information is available at: Mines and Money London 2014.

About Scorpio Gold

Scorpio Gold holds a 70% interest in the producing Mineral Ridge gold mining operation located in Esmeralda County, Nevada with joint venture partner Waterton Global Value L.P. (30%), and Scorpio Gold is currently entitled to receive 80% of cash flow generated. Mineral Ridge is a conventional open pit mining and heap leach operation. The Mineral Ridge property is host to multiple gold-bearing structures, veins and lenses at exploration, development and production stages. Scorpio Gold also holds a 100% interest in the advanced exploration-stage Goldwedge property and processing facility in Manhattan, Nevada. The Company is assessing its exploration plans for the Goldwedge property as well as the potential for toll milling at the Goldwedge plant, which is currently permitted for 400 tons per day.

Scorpio Gold's President, Steve Roebuck, PGeo, is a Qualified Person as defined by National Instrument 43-101 and has reviewed and approved the content of this release. 

ON BEHALF OF THE BOARD
SCORPIO GOLD CORPORATION


Peter J. Hawley,
CEO

For further information contact:
Steve Roebuck, President 
Tel: (819) 825-7618
Email: 

Investor Relations:
Jim Macdonald, Torrey Hills Capital
Tel: (858) 456-7300
Email: 

Website: www.scorpiogold.com

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release. 

The Company relies on litigation protection for forward-looking statements. This news release contains forward-looking statements that are based on the Company's current expectations and estimates. Forward-looking statements are frequently characterized by words such as "plan", "expect", "project", "intend", "believe", "anticipate", "estimate", "suggest", "indicate" and other similar words or statements that certain events or conditions "may" or "will" occur, and include, without limitation, statements regarding the Company's plans with respect to the exploration, development and exploitation of its Mineral Ridge project, including potential further exploration or development of the Bluelite deposit, any potential expansion of the current pit shell outline thereof, and any potential increase in the mineral reserve and resource estimate in respect thereof. Such forward-looking statements involve known and unknown risks, uncertainties and other factors that could cause actual events or results to differ materially from estimated or anticipated events or results implied or expressed in such forward-looking statements, including risks involved in mineral exploration and development programs and those risk factors outlined in the Company's Management Discussion and Analysis as filed on SEDAR. Any forward-looking statement speaks only as of the date on which it is made and, except as may be required by applicable securities laws, the Company disclaims any intent or obligation to update any forward-looking statement, whether as a result of new information, future events or results or otherwise. Forward-looking statements are not guarantees of future performance and accordingly undue reliance should not be put on such statements due to the inherent uncertainty thereof.

Subscribe to our Email List