Scorpio Gold Reports Results from 2014 Expansion Drilling at the Bluelite Satellite Deposit, Mineral Ridge Project, Nevada


Vancouver, August 11, 2014 - Scorpio Gold Corporation ("Scorpio Gold" or the "Company") (TSX-V: SGN) reports additional results from its 2014 satellite deposit drilling program at the 70% owned Mineral Ridge project, located in Nevada. The Bluelite deposit lies west of the currently producing Drinkwater and Mary/LC pits and 400 meters northwest of the leach pad.

On July 21, 2014, the Company reported an updated Life of Mine Plan ("LOM") for the Mineral Ridge Operation, which encompasses the currently producing Drinkwater and Mary/LC pits and five adjacent satellite deposits, including the Bluelite deposit. The cut-off date for the LOM was March 31, 2014. Continued drilling since the March 31, 2014 cut-off date is designed to potentially upgrade and increase the reported mineral reserve and resource estimate and potentially extend life of mine. Drilling on the Bluelite deposit continues to meet with success, returning significant intercepts both within and extending outside of the pit shell outline modelled in the updated LOM. 

Highlights from this latest phase of RC drilling on the Bluelite deposit include:

  • MR14880: 1.27 grams per tonne ("g/t") gold over 6.10 meters
  • MR14972: 6.51 g/t gold over 3.05 meters
  • MR14973: 1.45 g/t gold over 4.57 meters
  • MR14977: 7.68 g/t gold over 6.10 meters
  • MR14978: 5.28 g/t gold over 6.10 meters
  • MR141045: 12.42 g/t gold over 4.57 meters


A drill hole location map is available at: View Drill Plan.

Table 1. Bluelite Deposit - Significant Drill Results

Hole No. Azm (deg) Dip (deg) From (ft) To (ft) Width (ft) From (m) To (m) Width (m) Gold (OPT) Gold (g/t)
MR14879 0 -90 165 170 5 50.29 51.82 1.52 0.017 0.58
      190 195 5 57.91 59.44 1.52 0.027 0.93
      210 220 10 64.01 67.06 3.05 0.019 0.66
      240 245 5 73.15 74.68 1.52 0.013 0.45
      295 300 5 89.92 91.44 1.52 0.011 0.38
      320 330 10 97.54 100.58 3.05 0.031 1.06
MR14880 0 -90 200 205 5 60.96 62.48 1.52 0.02 0.69
      245 250 5 74.68 76.20 1.52 0.035 1.20
      225 250 25 68.58 76.20 7.62 0.030 1.01
      260 280 20 79.25 85.34 6.10 0.037 1.27
      330 335 5 100.58 102.11 1.52 0.036 1.23
MR14972 0 -90 40 50 10 12.19 15.24 3.05 0.190 6.51
      65 70 5 19.81 21.34 1.52 0.092 3.15
      105 110 5 32.00 33.53 1.52 0.017 0.58
MR14973 0 -90 60 75 15 18.29 22.86 4.57 0.042 1.45
MR14974 0 -90 115 125 10 35.05 38.10 3.05 0.040 1.25
      140 145 5 42.67 44.20 1.52 0.010 0.41
MR14975 0 -90 175 185 10 53.34 56.39 3.05 0.014 0.46
      195 200 5 59.44 60.96 1.52 0.010 0.35
      220 225 5 67.06 68.58 1.52 0.020 0.70
      285 290 5 86.87 88.39 1.52 0.017 0.60
      315 320 5 96.01 97.54 1.52 0.013 0.44
      335 340 5 102.11 103.63 1.52 0.030 1.01
      365 375 10 111.25 114.30 3.05 0.028 0.96
      440 450 10 134.11 137.16 3.05 0.034 1.16
MR14976 0 -90 190 195 5 57.91 59.44 1.52 0.062 2.13
      225 235 10 68.58 71.63 3.05 0.029 0.98
      425 430 5 129.54 131.06 1.52 0.038 1.30
MR14977 0 -90 45 65 20 13.72 19.81 6.10 0.224 7.68
      265 270 5 80.77 82.30 1.52 0.011 0.38
      280 285 5 85.34 86.87 1.52 0.010 0.34
      290 295 5 88.39 89.92 1.52 0.018 0.62
      345 360 15 105.16 109.73 4.57 0.023 0.79
      375 380 5 114.30 115.82 1.52 0.020 0.69
      440 445 5 134.11 135.64 1.52 0.022 0.75
MR14978 0 -90 50 70 20 15.24 21.34 6.10 0.154 5.28
      175 180 5 53.34 54.86 1.52 0.030 1.03
      260 265 5 79.25 80.77 1.52 0.013 0.45
      290 295 5 88.39 89.92 1.52 0.011 0.38
      390 395 5 118.87 120.40 1.52 0.015 0.51
MR141041 0 -90 195 205 10 59.44 62.48 3.05 0.019 0.65
MR141042 0 -90 No Significant Results
MR141043 0 -90 160 180 20 48.77 54.86 6.10 0.029 1.01
MR141044 0 -90 No Significant Results
MR141045 0 -90 35 50 15 10.67 15.24 4.57 0.362 12.42
incl.     40 45 5 12.19 13.72 1.52 1.030 35.31
MR141061 0 -90 No Significant Results
MR141062 0 -90 30 40 10 9.14 12.19 3.05 0.067 2.30
      110 115 5 33.53 35.05 1.52 0.018 0.62
MR141063 0 -90 135 140 5 41.15 42.67 1.52 0.018 0.60


All holes presented in Table 1 were completed by reverse circulation ("RC") drilling. True width is estimated at 80-100% of downhole width. Analytical results were performed by American Assay Laboratory Inc. in Sparks, Nevada, an ISO/IEC 17025:2005 accredited facility. External check assays to verify lab accuracy are routinely completed by ALS Chemex, an ISO 9001:2000 certified and ISO/IEC 17025:2005 accredited facility. Further details are presented in the Company's quality assurance and quality control program for the Mineral Ridge project at: View PDF.

About Scorpio Gold

Scorpio Gold holds a 70% interest in the producing Mineral Ridge gold mining operation located in Esmeralda County, Nevada with joint venture partner Waterton Global Value L.P. (30%), and Scorpio Gold is currently entitled to receive 80% of cash flow generated. Mineral Ridge is a conventional open pit mining and heap leach operation. The Mineral Ridge property is host to multiple gold-bearing structures, veins and lenses at exploration, development and production stages. Scorpio Gold also holds a 100% interest in the advanced exploration-stage Goldwedge property and processing facility in Manhattan, Nevada. The Company is assessing its exploration plans for the Goldwedge property as well as the potential for toll milling at the Goldwedge plant, which is currently permitted for 400 tons per day.

Scorpio Gold's President, Steve Roebuck, PGeo, is a Qualified Person as defined by National Instrument 43-101 and has reviewed and approved the content of this release.

ON BEHALF OF THE BOARD
SCORPIO GOLD CORPORATION


Peter J. Hawley,
CEO

For further information contact:
Steve Roebuck, President
Tel: (819) 825-7618
Email:

Investor Relations:
Jim Macdonald, Torrey Hills Capital
Tel: (858) 456-7300
Email:

Website: www.scorpiogold.com 

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

The Company relies on litigation protection for forward-looking statements. This news release contains forward-looking statements that are based on the Company's current expectations and estimates. Forward-looking statements are frequently characterized by words such as "plan", "expect", "project", "intend", "believe", "anticipate", "estimate", "suggest", "indicate" and other similar words or statements that certain events or conditions "may" or "will" occur, and include, without limitation, statements regarding the Company's plans with respect to the exploration, development and exploitation of its Mineral Ridge project, including potential further exploration or development of the Bluelite deposit, any potential expansion of the current pit shell outlines thereof, and any potential increase in the mineral reserve and resource estimate in respect thereof. Such forward-looking statements involve known and unknown risks, uncertainties and other factors that could cause actual events or results to differ materially from estimated or anticipated events or results implied or expressed in such forward-looking statements, including risks involved in mineral exploration and development programs and those risk factors outlined in the Company's Management Discussion and Analysis as filed on SEDAR. Any forward-looking statement speaks only as of the date on which it is made and, except as may be required by applicable securities laws, the Company disclaims any intent or obligation to update any forward-looking statement, whether as a result of new information, future events or results or otherwise. Forward-looking statements are not guarantees of future performance and accordingly undue reliance should not be put on such statements due to the inherent uncertainty thereof.

Subscribe to our Email List